Ever wonder what goes into building a performance off-road axle? Go behind the scenes at LM1 Metalworks as we assemble a third member, install an ARB Air Locker, set up the ring and pinion, and dial in the gear mesh. From precision setup to final assembly, every detail matters when building components designed to handle demanding off-road conditions or thousands of miles of highway punishment. Learn more about LM1 axles and components: https://lm1.biz. Subscribe for more axle builds, off-road engineering, product development, and behind-the-scenes footage from LM1 Metalworks.
Building an LM1 Third Member with Yukon Gears and ARB Airlocker
October 27, 2026
by
LM1
in LM1 Videos